Light Horse Interchange Night Time Lapse
From 2003 to the end of 2005 I worked on the M7 in Sydney. One of my jobs while there was looking after the balanced cantilever segmental erection over the M5, M4 and Norwest Blv challenging and enjoyable job but involved 6mths of night works. This video is a time laps of the M7/M4 interchange construction or what is now now as the Light Horse Interchange.


![vlcsnap-2011-06-17-18h25m37s152-[640x480] vlcsnap-2011-06-17-18h25m37s152-[640x480]](http://www.teda.id.au/wp-content/uploads/vlcsnap-2011-06-17-18h25m37s152-640x480-535x200.jpg)
![vlcsnap-2011-02-18-14h15m20s245 [640x480] vlcsnap-2011-02-18-14h15m20s245 [640x480]](http://www.teda.id.au/wp-content/uploads/vlcsnap-2011-02-18-14h15m20s245-640x480-535x200.png)
![vlcsnap-2011-03-15-07h02m54s244 [640x480] vlcsnap-2011-03-15-07h02m54s244 [640x480]](http://www.teda.id.au/wp-content/uploads/vlcsnap-2011-03-15-07h02m54s244-640x480-535x200.png)




Post Comments
subscribe to comments RSS
There are no comments for this post